- months to Expand Offer:
- ≤ 15 months
- Sales Speed:
- 5 deptos / months
- Ground use:
- Housing
- Housing Density:Density:
- ≥ 600 hab / ha
- Minimum height:
- 5 floors
- Constructibility:
- ≥ 1.3
- (a) Equip. School Education:(a) Equip. Educ. School:
- ≤ 1000 m
- (b) Equip. Pre-school education:(b) Equip. Educ. Pre-school:
- ≤ 1000 m
- (c) Health balance:
- ≤ 2,500 m
- (d) Public transport tours:(d) Public transport:
- ≤ 400 m
- (e) Medium-scale equipment:(e) Equip. Medium scale:
- ≤ 2,000 m
- (f) Green areas:(f) Pebl Green Areas (+ .5ha):
- ≤ 1000 m
- (g) Service liability +:
- ≤ 200 m
At least 500 metres from any camp or take.
The ground should be inside an Operating Territory.
To identify sectors with potential to develop DS19 projects while simultaneously meeting market conditions, PRC, distance, camps and health viability.
